How Halyard works
Halyard is opinionated about how work is structured, and it runs the coding agent that does the work inside the same system that plans and traces it. The planning scope is one project — one product or program. There is no cross-project rollup above that: a lead running five unrelated products opens five projects, not one portfolio view over them.
The hierarchy
Section titled “The hierarchy”Project → Vision → PRD → Requirement → Issue → Task → Session / PRwith Milestones as the planned work and delivery window for issues — issues can link to requirements.
- A project owns one Vision (the one-paragraph why), a shared document library, and its own Teams, Milestones, and issues.
- A PRD describes the requirements for a piece of product behavior — nothing more: no owner, target date, success measure, or status updates.
- A PRD breaks into requirements, each traced to the issues and tasks that implement it and the test cases that verify it.
- A Milestone is a dated window of work, owned by one Team, grouping the issues delivering that work right now.
- A task launches a session — one agent run — which produces a branch and eventually a pull request.
Five opinions
Section titled “Five opinions”- Health is always Halyard’s own computed read. Nobody posts a status update anywhere in Halyard — see the Status page for how Milestone health and PRD progress are computed and rolled up.
- Verified means tests actually passed. A requirement isn’t “done” because someone closed the issue; it’s verified once its test cases pass.
- Rules are fixed, not configured. Guardrails run the same way — blocking or warning — on every project and every team, always. Nobody turns one off.
- No story points, no sprints, no burndown. Halyard counts items done, not estimates. A Milestone is a dated window a team moves through by hand, not a fixed-length iteration.
- Work flows continuously off one ranked list. Anyone can take any Planned issue, and a per-person WIP limit caps how much is started at once — see How work flows.
The lightweight path
Section titled “The lightweight path”Not everything needs the full chain. A bug or a chore issue needs no PRD,
no requirement, and no Milestone — create it straight from the Inbox, work
it, and merge it. The heavier chain (Vision → PRD → Requirement → Test
case) exists for the part of the work that benefits from agreeing on scope
before it’s built. Most day-to-day issue traffic is bug fixes and small
chores that skip all of it, by design.
What this is deliberately not
Section titled “What this is deliberately not”- No sprints, velocity, or burndown. A Milestone has no fixed cadence and no chart behind it.
- No sizing. Every issue and requirement counts the same regardless of how big it is — progress and health count items done, not story points.
- No organization-level planning. Every PRD, Milestone, Team, and issue lives inside one project; there’s no portfolio-level requirement and no cross-project rollup.
- Teams grant no access. A Team says who’s responsible for what; access is a separate, project-level setting.
Next steps
Section titled “Next steps”- Create your first project and write its Vision.
- Write a PRD and requirements if the work needs agreed scope.
- Open a Milestone and a Team to organize the work.
- Dispatch an agent against your first issue.