How work flows
There’s no sprint to plan into. Work is pulled continuously off one ranked list, and the Board reflects that directly.
Planned is the ready queue
Section titled “Planned is the ready queue”Issues in Planned are ready to start — not a commitment inside a time box. Within a status column, issues sit in one ranked list: drag to reorder, top is most important.
Anyone can take any Planned issue, not just the top one. Click Take it on a Planned issue and it’s assigned to you and moved to Started — there’s no separate “claim” step.
The WIP limit
Section titled “The WIP limit”A per-person WIP limit keeps started work sane: nobody has more than 4 issues started at once by default (the WIP limit guardrail). Taking an issue past your limit still works — it’s fixed Warn, never a block — but it flags it. A project admin can tune the limit number in Settings → Health & testing; see Guardrails for the rest of how the WIP limit and the other rules work.
Backlog and Inbox
Section titled “Backlog and Inbox”Backlog is the project-wide pool of issues that aren’t in any Milestone yet — on the Board it’s always visible as its own column, regardless of which Milestone you’re scoped to. Inbox is where outside signal — a GitHub mention, an assigned ticket — lands before someone decides it’s worth turning into a real issue.
Grouping and scoping the board
Section titled “Grouping and scoping the board”Beyond the status columns, the Board can group by team, milestone, or
assignee instead — see Teams. To narrow to your own issues or
your own team’s, use the Board’s Teams/People sidebar sections rather than a
separate scope filter. A Board · List · Timeline toggle switches the same
view between kanban columns, a flat list (the one issues list — it replaces
the old, separate Issues page), and a timeline across every Milestone.
What replaced story points
Section titled “What replaced story points”The rank you drag issues into replaces the separate priority number issues used to carry — it seeds the initial order once, then the field goes away. Requirements keep their own priority field; this doesn’t touch it. See How Halyard works for why Halyard counts items done instead of estimating size.