How work flows

There’s no sprint to plan into. Work is pulled continuously off one ranked list, and the Board reflects that directly.

Issues in Planned are ready to start — not a commitment inside a time box. Within a status column, issues sit in one ranked list: drag to reorder, top is most important.

Anyone can take any Planned issue, not just the top one. Click Take it on a Planned issue and it’s assigned to you and moved to Started — there’s no separate “claim” step.

A per-person WIP limit keeps started work sane: nobody has more than 4 issues started at once by default (the WIP limit guardrail). Taking an issue past your limit still works — it’s fixed Warn, never a block — but it flags it. A project admin can tune the limit number in Settings → Health & testing; see Guardrails for the rest of how the WIP limit and the other rules work.

Backlog is the project-wide pool of issues that aren’t in any Milestone yet — on the Board it’s always visible as its own column, regardless of which Milestone you’re scoped to. Inbox is where outside signal — a GitHub mention, an assigned ticket — lands before someone decides it’s worth turning into a real issue.

Beyond the status columns, the Board can group by team, milestone, or assignee instead — see Teams. To narrow to your own issues or your own team’s, use the Board’s Teams/People sidebar sections rather than a separate scope filter. A Board · List · Timeline toggle switches the same view between kanban columns, a flat list (the one issues list — it replaces the old, separate Issues page), and a timeline across every Milestone.

The rank you drag issues into replaces the separate priority number issues used to carry — it seeds the initial order once, then the field goes away. Requirements keep their own priority field; this doesn’t touch it. See How Halyard works for why Halyard counts items done instead of estimating size.